- Final account dispute for a football club in respect of their new stadium development involving three adjudications and a mediation (£3 million) covering issues surrounding failure to meet specification, defects, valuation and delay.
- Acting on behalf of a housing and care provider in respect of arbitration proceedings in relation to care home defects claim relating to breaches of Building Regulations including in relation to firestopping (£6 million)
- Arbitration proceedings relating to the construction of a hotel in Bognor Regis by the modular sub-contractor (£4 million)
- Acting for a contractor in a claim against a developer in the Court of Appeal (Farrah & Anor v Rylatt & Ors [2019] EWCA Civ 1864)
- London TCC proceedings in respect of a façade collapse during a redevelopment of a Grade II listed building in Bradford city centre (£6 million) including reported interim hearing on preliminary issues (Aldersgate Estates Ltd v HAM Construction Ltd [2013] EWHC 104 (TCC))
- London TCC proceedings in respect of a defective concrete floor at a flour mill including business interruption claim in addition to remedial cost where it related to the company’s sole mill and storage facility (£1.5 million).
- Lead more than a hundred sets of adjudication proceedings for developers, contractors, sub-contractors and consultants in respect of multifarious disputes.
- Numerous sets of adjudication proceedings for a large contractor for various businesses thereunder and relating to multiple issues including delay, disruption, defects, interim valuations and final accounts with values from £50k to £1 million.
- Lead successful defence of Part 8 proceedings relating to adjudication enforcement in the London TCC (Aecom Design Build Ltd v Staptina Engineering Services Ltd [2017] EWHC 723 (TCC))
- Lead numerous sets of adjudication enforcement proceedings including 4MA Ltd (t/a 4M Group) v Nash [2019] EWHC 3760 (TCC)
- Various disputes for an engineering company acting as sub-contractor for the design and installation of grille flooring to all levels of the redevelopment of the MacAllan Distillery and visitor centre both up and down the contractual chain.