Skip to content

I submitted my online visa application but couldn’t book an appointment, what should I do?

Normally, once you have submitted the online visa application and paid the fee, you have to attend an appointment to enrol your biometrics and verify your passport within 45 days. This requirement has been relaxed due to the visa application centres being closed.

Now that application centres have mostly reopened, you must book and attend an appointment to complete the application process. However, the Home Office has recently introduced the IDV app which allows applicants who previously gave their fingerprints as part of a previous application since July 2015, to upload a photo electronically. There will then be no need to attend a Visa Application Centre to submit their biometrics. Applicants who are eligible to use this electronic option will be contacted by UKVI.

Related FAQs

Can I reduce the risk of IR35 applying?

It is possible to review working arrangements for contractors before the new rules come into effect. This will require immediate action.

You could consider terminating current contracts and entering into new terms that reflect working arrangements for a self-employment arrangement.

Another possibility is encouraging contractors to abandon the PSC model and provide services under a compliant umbrella company.

In the event of a determination of employed status you should seek to enter new terms that at the very least reflect the new tax arrangements .

How do I guard against contractor insolvency in the construction industry?

It is almost impossible to completely guard against the risks associated with contractor insolvency, but there are some steps which can assist in mitigating and managing the risks involved.   To be in the best possible position, it is worth considering the following at the outset of any project:

  • Check the contractor’s financial position – particularly the specific company which will enter into the building contract, as the employer’s rights will be against this company rather than the business as a whole
  • Take legal advice to ensure that the building contract is properly drafted with appropriate provisions to deal with an insolvency event
  • Consider requiring a performance bond and/or parent company guarantee (each serve slightly different purposes)
  • Obtain collateral warranties from the consultants and sub-contractors involved, so that there are contractual rights against other parties if the contractor is no longer able to meet claims
  • Consider requiring retention bonds, advance payment bonds or vesting certificates if necessary
  • Project bank accounts and escrow accounts can also provide some further assurances for the parties involved
How often do MHFA qualifications need updating?

The recommendation is every 3 years, however it is recommended that MHFAs receive regular ongoing training and support.

How do I avoid disputes and approach extensions of time and claims for additional payment with my Employer or Supplier?

The Construction Leadership Council (with backing from the Government) has issued practical guidance and draft pro-forma documents to enable all parties involved in the construction supply chain to enter into collaborative and open dialogue about applications for extensions of time and additional payment and to minimise potential disputes. The guidance can we downloaded here

The draft letters and notices included in the guidance have been prepared on the basis of the standard JCT Design and Build 2016 and NEC 3/4 Engineering and Construction Contract (Option A) and parties will need to make sure that they are completed/adjusted to comply with their own specific contracts.

The Cabinet Office has also issued a general statement calling on parties to contracts adversely affected by C-19 to act responsibly and fairly and to support national efforts to protect jobs and the economy.