How do I avoid disputes and approach extensions of time and claims for additional payment with my Employer or Supplier?
The Construction Leadership Council (with backing from the Government) has issued practical guidance and draft pro-forma documents to enable all parties involved in the construction supply chain to enter into collaborative and open dialogue about applications for extensions of time and additional payment and to minimise potential disputes. The guidance can we downloaded here
The draft letters and notices included in the guidance have been prepared on the basis of the standard JCT Design and Build 2016 and NEC 3/4 Engineering and Construction Contract (Option A) and parties will need to make sure that they are completed/adjusted to comply with their own specific contracts.
The Cabinet Office has also issued a general statement calling on parties to contracts adversely affected by C-19 to act responsibly and fairly and to support national efforts to protect jobs and the economy.
Related FAQs
A quicker and more cost-effective option may be the involvement of the police given their recent allocation of emergency powers to disperse, fine or even arrest persons who flout these rules. Nevertheless, it appears that the Court is willing to support housing providers in their efforts to tackle anti-social behaviour during this time.
The amount an insurer charges for providing cover is a critical aspect of the underwriting process. The premium must be sufficient to cover expected claims but must also take into account the possibility that the insurer will have to access its capital reserve –it is risk assessment based and the greater the risk, the higher the premium. Historically, insurers of high-rise buildings would have only had to prepare for a loss caused by damage to just a few flats within a building. That is because the design and construction of that building, with the right materials and fire safety provisions in place, should have limited the spread of fire and allowed the damage to be contained –or at least make this an extremely low risk. Now we know that many buildings have been designed, built and signed off in a regulatory system that an independent Government review has found was not fit for purpose. Premiums will reduce overtime but will be dependent upon the perceived level of risk reducing as the regulatory regime, BSA and BSR become more established.
The Home Office has not stated when it will end these temporary measures, albeit it has stated that it will provide a warning. Where employers have carried out checks using the temporary measures, the Home Office has confirmed that it will require employers to carry out retrospective checks on any of the following:
- Employees who started working for you when the temporary measures were in place
- Employees who required a follow up check during the temporary measures (for example because their previous leave was coming to an end).
It is not explicit from the guidance but these retrospective checks must require you to have in your possession the physical ID in its original form. When carrying out the retrospective check, employers must record this using the following wording “the individual’s contract commenced on [insert date]. The prescribed right to work check was undertaken on [insert date] due to Covid-19.”
These further checks must be made within eight weeks of the temporary measures ending, and employers must keep records of both checks undertaken. Where the employer discovers that the employee does not have the right to work during the retrospective check they should stop employing them.
The government introduced The Working Time (Coronavirus) (Amendment) Regulations 2020 to amend the Working Time Regulations 1998 to allow for the change.
The BBC
The national broadcaster’s collated content surrounding the Covid-19 pandemic:
https://www.bbc.co.uk/news/coronavirus
and with regards to business:
https://www.bbc.co.uk/news/business