Who is responsible for planning in the event of an excess of deaths?
In the unfortunate event that there will be a significant number of deaths, planning will fall to the local resilience forum; which includes all relevant local organisations and statutory bodies, who will have prior experience in working in excessive death scenarios.
It is for the coroners to ensure that they are familiar with the local resilience forum plans and discussions required. This will include issues regarding storage capacity and post-mortem examination capacity.
Related FAQs
CMA guidance suggests that it will not take enforcement action in respect of agreements which:
- Are appropriate and necessary to avoid a shortage, or ensure security, of supply
- Are clearly in the public interest
- Contribute to the benefit or wellbeing of consumers
- Deal with critical issues that arise as a result of the Covid-19 pandemic
- Last no longer than is necessary to deal with these critical issues
In the event that the worst happens and contractor insolvency occurs, there are a number of steps which the employer should take immediately:
- Confirm that insolvency has actually occurred and the type of insolvency (for example liquidation or adjudication) – actions taken based on rumours can have adverse consequences
- Secure the site and carry out an audit of the plant, equipment and materials present – this may extend to changing the locks on site in order to prevent overzealous contractors and sub-contractors seeking to return and take what they see as their possessions. The building contract may contain a provision that these are the employer’s property, but they can be difficult to recover if they are not within the employer’s possession – possession is 9/10ths of the law!
- Ensure that there are adequate insurance and health and safety arrangements in place for the site – these would usually be dealt with by the contractor and therefore may no longer be in place, so alternative arrangements may be required
- Ensure that any further payments to the contractor are stopped pending a more detailed review
- Consider whether any off-site materials have already been paid for and can be secured. This can however be difficult in practice where the materials are not physically within the employer’s possession
In addition, there are also a number of further actions which the employer should consider in the slightly longer term:
- Investigate the options available and ascertain the cost of completing the works to assist in deciding how best to proceed
- Consider whether termination of the contractor’s employment under the building contract is required, and if so take the necessary steps in accordance with the building contract
- Consider whether there are any bonds or guarantees in place upon which the employer can rely, and if so assess their terms as to whether and how to make a claim
- Make arrangements to complete the works – as a general rule of thumb the cost of completing the works may increase by around 30% if it is necessary to get a replacement contractor
- Consider whether direct payment to subcontractors is possible or desirable
- Although we would say this(!) we would strongly recommend taking legal advice, as insolvency and its implications are complex and it is easy to inadvertently fall foul of the various different requirements
There is no simple answer.
The NFCC guidance states:
“The person-centred fire risk assessment is intended only as a simple means for non-specialists who have suitable understanding of relevant fire risks to determine whether additional fire precautions might be needed. The person who carries out the person-centred fire risk assessment will depend on the circumstances of the housing and support provision. It can be carried out by those who regularly engage with the resident, with input from specialists where necessary. Assessments will normally be undertaken with residents themselves.
In sheltered housing with scheme managers, the scheme managers normally engage with residents on a routine basis, enabling residents who need a person-centred fire risk assessment to be identified. Many vulnerable residents will be in receipt of care, so enabling the care provider to identify residents in need of a person-centred fire risk assessment. Providers of regulated care are required to take into account risks to people from their wider environment, to take steps to help people ensure that they are dealt with by appropriate agencies, or to raise safeguarding alerts when this is appropriate. Where a ‘stay put’ strategy is adopted, there will be a need to identify residents who need assistance from the fire and rescue service to evacuate the building.
In supported housing, the number of residents in each property is usually quite small. This, and the nature of the care service normally provided, enables person-centred fire risk assessments to be carried out asa matter of course, when a resident first moves into the property.
Where additional fire precautions cannot be provided in the short term, the risk should be reduced as far as reasonably practicable and an adult at risk referral should be made to Adult Social Care.”
Ideally then the RP will need to engage with any care providers in order to conduct the PCRA and identify risk mitigation measures. If they are reluctant to do so, the RP should engage with the individual in any event in undertaking the assessment.
That will depend on the terms of your facility and the stance taken by your bank.
Banking facilities often place obligations on businesses to stick to certain financial criteria. For example, an obligation to keep turnover or profit above certain levels or a commitment to keep the bank’s exposure within an agreed percentage of the value of the company’s assets (known as loan to value ratio).
The consequences of breaching those covenants will depend on the terms of your facility, but normally this amounts to an event of default. Events of default can result in the loan (or whatever form the facility takes) becoming repayable and could give the bank certain powers to take action to recover the money that they are owed.
Whether the bank will take action during these unprecedented times is another matter, particularly given the extent of support being offered to businesses via mainstream lenders and the political desire to keep viable businesses up and running. Lenders themselves will no doubt wish to remain supportive where possible. The underlying performance of the business (and whether but for the effects of Covid-19 it would have been in a healthy financial position), the relationship you have with the bank and your history with them will no doubt be relevant to the approach taken by the bank. However, early engagement with your bank (as well as other key stakeholders in the business) will be important.
All employers have a duty to prevent illegal working, and carrying out proper Right to Work checks are a fundamental part of this. In light of Covid-19, the Home Office has brought in some temporary measures for employers to use to carry out the requisite Right to Work checks. Failure to follow these could lead to enforcement action and penalties.